Review a quote: what a software proposal has to contain

Quotes for the same project routinely differ by a factor of five. The difference is almost never the day rate — it is what the quote leaves out: who produces the content, what happens when a connected system fails, who owns the code at the end, what maintenance costs. This page lists the sixteen items we check when a client sends us a proposal for a second opinion, and you can run your own proposal text against them here.

  • Sixteen checks in four groups: scope, delivery, commercial terms, after launch.
  • Each with the reason its absence costs money later.
  • The review tells you which items your quote covers — and quotes the sentence it relied on.
  • It scores completeness, not price. Whether a price is fair depends on your context.

The checklist

These are the checks. Paste your proposal above and every row gets a verdict; without that, the list is a template you can work through by hand.

Scope

  • Itemised scope instead of one lump line

    A single line reading "website incl. design and build" is neither comparable nor enforceable. Anything unnamed becomes a change order later.

  • Who produces content (copy, images, translations)

    The most common cause of late projects. If the quote is silent, the work quietly sits with you.

  • Integrations named, including error handling

    "Connection to your system" is not a line item. The effort is not in connecting but in failure cases and changes on the other side.

  • Accessibility (WCAG 2.1 AA / European Accessibility Act)

    Mandatory since June 2025 for a large share of consumer-facing offerings. Retrofitting costs several times more because it lives in the design system.

  • Supported browsers, devices and OS versions

    Without this, every bug report on an old device becomes a negotiation.

Delivery

  • QA as its own line item

    If testing is not shown, it is either not planned or taken out of development time. You notice either only after launch.

  • Milestones with dates and acceptance criteria

    "Roughly 8 weeks" with no interim deliverables means you see the result at the end and argue then.

  • How change requests are handled (process and rate)

    Without a defined process every change is an individual negotiation — and your position weakens once the project is running.

  • Who does the work (seniority, contact, subcontractors)

    A day rate says little if it is unclear who delivers it. Ask about subcontractors explicitly.

Commercial terms

  • Fixed price or time and materials — and what happens on overrun

    A fixed price without settled scope is either padded for risk or corrected through change orders.

  • Payment schedule tied to milestones

    Payment up front with nothing delivered moves the entire risk to you.

  • Rights to code and design, access to the repository

    If rights are not transferred, you cannot change supplier without rebuilding.

  • Third-party costs stated (licences, plugins, hosting)

    Recurring subscriptions do not belong in a footnote. They shape the next five years of cost.

After launch

  • Maintenance and operations after launch, priced

    Budget 15–25% of build cost per year. Without this line, comparing two quotes is meaningless.

  • Warranty: what counts as a defect, for how long, how fast

    Without a definition, after sign-off every defect is billable work.

  • Handover: documentation, credentials, training

    A project without handover ties you to the supplier even when the contract does not.

What this review does not do

  • It does not judge price. Whether €40,000 is a lot for your project depends on scope and context — the cost calculators are for that.
  • It is not a legal review. Liability, delay, termination and rights transfer clauses belong with a lawyer.
  • It reads what is written. What was promised verbally is not in the quote — which is rather the point.
  • A high score means "complete", not "good". A well-written proposal can still describe the wrong project.

Frequently asked questions

  • Because they contain different things. Day rates vary moderately; scope varies enormously. A quote without content production, without QA, without maintenance and without rights transfer is necessarily cheaper than one that includes them — until the missing parts are ordered separately.